Simpson AT13 Adhesive 12.5 oz. Cartridge, SIMAT-13


MSRP: $39.00
$26.00
You Save: $13.00 (33 %)
unlimited
Simpson Strong-Tie Anchors
Manufacturer: Simpson Strong-Tie Anchors
Manufacturer Part No: AT-13
PHTS Number: SIMAT-13

APPLICATION

Surfaces to receive adhesive must be clean and free of frost. The base material temperature must be 0°F or above at the time of installation. For information on installations below 0°F contact Simpson Strong-Tie. Mixed material in nozzle can harden in 5–7 minutes. 

USES

  • Threaded rod anchoring
  • Rebar doweling
  • Pick-proof sealant around doors, windows and fixtures

SHELF LIFE

12 months from date of manufacture in unopened cartridge.

STORAGE CONDITIONS

For best results store between 32°F – 80°F. Partially used cartridges can be stored for a limited time by leaving nozzle in place. To re-use, attach new nozzle.

COLOR

Resin — white, initiator — black When properly mixed, adhesive will be a uniform gray color.

CLEAN UP

Uncured material — Wipe up with cotton cloths. If desired scrub area with abrasive, water-based cleaner and flush with water. If approved, solvents such as ketones (MEK, acetone, etc.), lacquer thinner, or adhesive remover can be used. DO NOT USE SOLVENTS TO CLEAN ADHESIVE FROM SKIN. Take appropriate precautions when handling flammable solvents. Solvents may damage surfaces to which they are applied. Cured material – Chip or grind off surface.

CHEMICAL RESISTANCE

Very good to excellent against distilled water and inorganic acids. Fair to good against organic acids and alkalis, inorganic alkalis, and many organic solvents. Poor against ketones.

AT Cartridge Systems
at cartridge systems
  1. Cartridge Estimation Guides are available Call Powerhouse Tool & Supply, 1-800-866-5833.
  2. Detailed information on dispensing tools, mixing nozzles and other adhesive accessories is available here.
  3. Use only appropriate Simpson Strong-Tie® mixing nozzle in accordance with Simpson Strong-Tie instructions. Modification or improper use of mixing nozzle may impair AT adhesive performance.
In-Service Temperature Sensitivity
at temps
  1. ADHESIVE ANCHORING INSTALLATION INSTRUCTIONS

     

    cautionNOTE: Always check expiration date on product label. Do not use expired product.

     

    cautionWARNING: When drilling and cleaning hole use eye and lung protection. When installing adhesive use eye and skin protection.

     
    1. HOLE PREPARATION: Horizontal, Vertical and Overhead Applications

    Notes: 
    Refer to Hole Cleaning Brushes for proper brush part number.


    1 - Drill

    1. Drill – 
    Drill hole to specified diameter and depth.

    2 - Blow

    2. Blow – 
    Remove dust from hole with oil-free compressed air for a minimum of 4 seconds. Compressed air nozzle must reach the bottom of the hole.

    3 - Brush

    3. Brush – 
    Clean with a nylon brush for a minimum of 4 cycles. Brush should provide resistance to insertion. If no resistance is felt, the brush is worn and must be replaced.

    4 - Blow

    4. Blow – 
    Remove dust from hole with oil-free compressed air for a minimum of 4 seconds. Compressed air nozzle must reach the bottom of the hole.



    2. CARTRIDGE PREPARATION

    Notes: 
    Refer to Mixing Nozzles for proper mixing nozzle andAdhesive Dispensing Tools for dispensing tool part number.


    1. Check – 
    Check expiration date on product label. Do not use expired product.Product is usable until end of printed expiration month.

    2. Open – 
    Open cartridge per package instructions.

    AttachNote: For bulk dispensing, check pail or drum label for detailed mixing and preparation instructions.
    Attach

    3. Attach – Attach proper Simpson Strong-Tie® nozzle to cartridge. Do not modify nozzle.

    4 - Blow

    4. Insert – Insert cartridge into dispensing tool.

    4 - Blow

    5. Dispense – Dispense adhesive to the side until properly mixed (uniform color).



    3. FILLING THE HOLE: Vertical Anchorage

    Prepare the hole per instructions "Hole Preparation".
    Note: Nozzle extensions may be needed for deep holes.

    Dry and Damp Holes:


    Fill

    1. Fill – 
    Fill hole 1/2 - 2/3 full, starting from bottom of hole to prevent air pockets. Withdraw nozzle as hole fills up.

    Insert

    Threaded rod or rebar

    2. Insert –Insert clean, oil free anchor, turning slowly until the anchor contacts the bottom of the hole.

    Do not disturb

    3. Do not disturb – Do not disturb anchor until fully cured. (See cure schedule for specific adhesive.)



    Water Filled Holes:


    Fill

    1. Fill – 
    Fill holecompletely full, starting from bottom of hole to prevent water pockets. Withdraw nozzle as hole fills up.

    Insert

    Threaded rod or rebar

    2. Insert –Insert clean, oil-free anchor, turning slowly until the anchor contacts the bottom of the hole.

    Do not disturb

    3. Do not disturb – Do not disturb anchor until fully cured. (See cure schedule for specific adhesive.)



      FILLING THE HOLE: Horizontal and Overhead Anchorage

    Prepare the hole per instructions "Hole Preparation". 
    Note: Nozzle extensions may be needed for deep holes.

    Install

    1. Install – Install Simpson Strong-Tie® ARC adhesive retaining cap. Refer toAdhesive Retaning Caps for proper ARC size.

    Fill

    2. Fill – Fill hole 1/2 - 2/3 full, starting from bottom of hole to prevent air pockets. Withdraw nozzle as hole fills up.



    Insert


    Threaded rod or rebar


    3. Insert – Insert clean, oil-free anchor, turning slowly until the anchor contacts the bottom of the hole.

    Do Not Disturb


    Threaded rod or rebar


    4. Do not disturb – Do not disturb anchor until fully cured. (See cure schedule for specific adhesive.)



      FILLING THE HOLE: When Anchoring with Screens: For AT, ET-HP, and SET Adhesives (except SET1.7KT)

    Prepare the hole per instructions "Hole Preparation".

    Fill

    1. Fill – Fill screen completely. Fill from the bottom of the screen and withdraw the nozzle as the screen fills to prevent air pockets. (Opti-Mesh® screens: Close integral cap after filling.)

    Insert

    2. Insert – Insert adhesive filled screen into hole.



    Insert

    3. Insert – Insert clean, oil free anchor, turning slowly until the anchor contacts the bottom of the screen.

    Do Not Disturb

    4. Do not disturb – Do not disturb anchor until fully cured. (See cure schedule for specific adhesive.)



     

Product Reviews

(0 Ratings, 0 Reviews)